Basic Assessment for the Proposed Development of a Transmission Line and associated electrical infrastructure to support the proposed Kap Vley Wind Energy Facility, south-east of Kleinzee, Northern Cape Province

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

Juwi Renewable Energies (Pty) Ltd (hereinafter referred to as “juwi”), through its project company Kap Vley Wind Farm (Pty) Ltd, proposes to construct and operate the Kap Vley Wind Energy Facility (WEF) and associated electrical infrastructure 30 km south-east of Kleinzee in the Northern Cape (see Figure A1.1). The proposed Kap Vley WEF will connect to Eskom’s Gromis Substation located on the remainder of the Farm Dikgat 195, or closer to the new proposed Eskom substation for which the location still needs to be finalised, via a 132 kV powerline. juwi is also proposing the development of electrical infrastructure to connect the abovementioned Kap Vley WEF to the Gromis or proposed Eskom Substation, and to ensure that the electricity generated by the proposed WEF feeds into the national grid. The associated powerline to support the proposed Kap Vley WEF is the subject of this Basic Assessment (BA) process. Electrical infrastructure will be constructed within a 200m wide assessed electrical infrastructure corridor.

ApplicationDate: 

Thursday, July 5, 2018 - 14:41

CaseID: 

12676

OtherReferences: 

Heritage Reports: 

ReferenceList: 

Images
 
 

Search form